Gather required tools and equipment
Before installing the 3040 40U cabinet, make sure you have required tools and equipment.
-
Gather all items listed in the following table.
Item Included with the cabinet 3/4-in. wrench (supplied in the shipping crate) — To raise and lower the leveling feet under the cabinet.
1/4-in. Allen wrench — To raise and lower the stability foot in the front of the cabinet.
NEMA L6-30
AC power cords — To connect the cabinet to external power sources (wall plugs).
-
The NEMA L6-30 connectors are for use in the USA and Canada.
-
The IEC-60309 connectors are for use worldwide, except for USA and Canada.
Each PDU must be connected to an independent power source. IEC-60309
SAS cables (optional) – Two cables are included with each drive tray, while host side cables must be purchased separately.
Communication cables (optional) – To attach the tray to the host.
Refer to the appropriate controller-drive tray installation guide for additional required items.
Mountable cable spools – Installed along both sides of the vertical power distribution outlets to accommodate excess cable length and cable routing. Two cable spools are included with each controller-drive tray. Cable spools are also shipped with standalone drive trays.
Shears – To cut the metal bands on the shipping crate.
Forklift (optional) – To remove the cabinet from the shipping pallet.
Front panel kits (optional) – To cover the empty bays at the front of the cabinet.
Antistatic bags (optional) – To protect components that are removed during the installation procedure for the cabinet.
-