Skip to main content
ONTAP MetroCluster

Installing and cabling the MetroCluster components in a configuration with array LUNs

Contributors

For setting up a MetroCluster configuration with array LUNs, you must cable the storage controllers to the FC switches and cable the ISLs to link the sites. In addition, you must cable the storage arrays to the FC switches.