Cabling the new MetroCluster controllers to the existing FC fabrics
On each controller in the clustered ONTAP MetroCluster configuration, the FC-VI adapter and HBAs must be cabled to specific ports on the existing FC switches.
-
Cable the FC-VI and HBA ports according to the following table:
Site A
Site B
Connect this Site A component and port…
FC_switch_A_1 port…
Connect this Site B component and port…
FC_switch_B_1 port…
controller_A_1 FC-VI port 1
32
controller_B_1 FC-VI port 1
32
controller_A_1 HBA port 1
33
controller_B_1 HBA port 1
33
controller_A_1 HBA port 2
34
controller_B_1 HBA port 2
34
controller_A_2 FC-VI port 1
35
controller_B_2 FC-VI port 1
35
controller_A_2 HBA 1
36
controller_B_2 HBA 1
36
controller_A_2 HBA 2
37
controller_B_2 HBA 2
37
-
Cable each FC-SAS bridge in the first switch fabric to the FC switches.
The number of bridges varies depending on the number of SAS storage stacks.
Site A
Site B
Cable this site A bridge…
FC_switch_A_1 port…
Cable this Site B bridge…
FC_switch_B_1 port…
bridge_A_1_38
38
bridge_B_1_38
38
bridge_A_1_39
39
bridge_B_1_39
39
-
Cable each bridge in the second switch fabric to the FC switches.
The number of bridges varies depending on the number of SAS storage stacks.
Site A
Site B
Cable this site A bridge…
FC_switch_A_2 port…
Cable this Site B bridge…
FC_switch_B_2 port…
bridge_A_2_38
38
bridge_B_2_38
38
bridge_A_2_39
39
bridge_B_2_39
39