The requested article is not available. Either it doesn't apply to this version of the product or the relevant information is organized differently in this version of the docs. You can search, browse, or go back to the other version.
Powering on the equipment at the disaster site (MetroCluster IP configurations)
-
PDF of this doc site
-
Install a fabric-attached MetroCluster
-
Cable a fabric-attached MetroCluster configuration
-
Plan and install a MetroCluster configuration with array LUNs
-
-
Install a MetroCluster IP configuration
-
Install a stretch MetroCluster configuration
-
Maintain the MetroCluster components
-
Transition from MetroCluster FC to MetroCluster IP
-
Upgrade, refresh, or expand the MetroCluster configuration
-

Collection of separate PDF docs
Creating your file...
This may take a few minutes. Thanks for your patience.
Your file is ready
You must power on the disk shelves and MetroCluster IP switches components at the disaster site. The controller modules at the disaster site remain at the LOADER prompt.
About this task
The examples in this procedure assume the following:
-
Site A is the disaster site.
-
Site B is the surviving site.
Steps
-
Turn on the disk shelves at the disaster site and make sure that all disks are running.
-
Turn on the MetroCluster IP switches if they are not already on.