Replacing a pair of FibreBridge 6500N bridges with 7600N or 7500N bridges

Contributors netapp-pcarriga netapp-ahibbard netapp-thomi netapp-aherbin

To take advantage of the additional FC2 port on the FibreBridge 7600N or 7500N bridges and reduce rack utilization, you can nondisruptively replace 6500N bridges and consolidate up to four storage stacks behind a single pair of FibreBridge 7600N or 7500N bridges.

Before you begin

You need the admin password and access to an FTP or SCP server.

About this task

You should use this procedure if:

  • You are replacing a pair of FibreBridge 6500N bridges with FibreBridge 7600N or 7500N bridges.

    After the replacement, both bridges in the pair must be the same model.

  • You previously replaced a single FibreBridge 6500N bridge with a 7600N or 7500N bridge and are now replacing the second bridge in the pair.

  • You have a pair of FibreBridge 7600N or 7500N bridges with available SAS ports and you are consolidating SAS storage stacks that are currently connected using FibreBridge 6500N bridges.

This procedure is nondisruptive and takes approximately two hours to complete.

Verifying storage connectivity

Before replacing bridges, you should verify bridge and storage connectivity. Familiarizing yourself with the command output enables you to subsequently confirm connectivity after making configuration changes.

You can issue these commands from the admin prompt of any of the controller modules in the MetroCluster configuration at the site undergoing maintenance.

  1. Confirm connectivity to the disks by entering the following command on any one of the MetroCluster nodes:

    run local sysconfig -v

    The output shows the disks attached to the initiator ports on the controller, and identifies the shelves connected to the FC-to-SAS bridges:

    node_A_1> run local sysconfig -v
    NetApp Release 9.3.2X18: Sun Dec 13 01:23:24 PST 2017
    System ID: 4068741258 (node_A_1); partner ID: 4068741260 (node_B_1)
    System Serial Number: 940001025471 (node_A_1)
    System Rev: 70
    System Storage Configuration: Multi-Path HA**<=== Configuration should be multi-path HA**
    .
    .
    .
    slot 0: FC Host Adapter 0g (QLogic 8324 rev. 2, N-port, <UP>)**<=== Initiator port**
    		Firmware rev:      7.5.0
    		Flash rev:         0.0.0
    		Host Port Id:      0x60130
    		FC Node Name:      5:00a:098201:bae312
    		FC Port Name:      5:00a:098201:bae312
    		SFP Vendor:        UTILITIES CORP.
    		SFP Part Number:   FTLF8529P3BCVAN1
    		SFP Serial Number: URQ0Q9R
    		SFP Capabilities:  4, 8 or 16 Gbit
    		Link Data Rate:    16 Gbit
    		Switch Port:       brcd6505-fcs40:1
      **<List of disks visible to port\>**
    		 ID     Vendor   Model            FW    Size
    		brcd6505-fcs29:12.126L1527     : NETAPP   X302_HJUPI01TSSM NA04 847.5GB (1953525168 512B/sect)
    		brcd6505-fcs29:12.126L1528     : NETAPP   X302_HJUPI01TSSA NA02 847.5GB (1953525168 512B/sect)
    		.
    		.
    		.
    		**<List of FC-to-SAS bridges visible to port\>**
    		FC-to-SAS Bridge:
    		brcd6505-fcs40:12.126L0        : ATTO     FibreBridge6500N 1.61  FB6500N102980
    		brcd6505-fcs42:13.126L0        : ATTO     FibreBridge6500N 1.61  FB6500N102980
    		brcd6505-fcs42:6.126L0         : ATTO     FibreBridge6500N 1.61  FB6500N101167
    		brcd6505-fcs42:7.126L0         : ATTO     FibreBridge6500N 1.61  FB6500N102974
    		.
    		.
    		.
      **<List of storage shelves visible to port\>**
    		brcd6505-fcs40:12.shelf6: DS4243  Firmware rev. IOM3 A: 0200  IOM3 B: 0200
    		brcd6505-fcs40:12.shelf8: DS4243  Firmware rev. IOM3 A: 0200  IOM3 B: 0200
    		.
    		.
    		.

Hot-swapping FibreBridge 6500N bridges to create a pair of FibreBridge 7600N or 7500N bridges

To hot-swap one or two FibreBridge 6500N bridges to create a configuration with a pair of FibreBridge 7600N or 7500N bridges, you must replace the bridges one at a time and follow the correct cabling procedure. The new cabling is different from the original cabling.

About this task

You can also use this procedure if the following conditions are true:

  • You are replacing a pair of FibreBridge 6500N bridges that are both connected to the same stack of SAS storage.

  • You previously replaced one FibreBridge 6500N bridge in the pair, and your storage stack is configured with one FibreBridge 6500N bridge and one FibreBridge 7600N or 7500N bridge.

    In this case, you should start with the step below to hot-swap the bottom FibreBridge 6500N bridge with a FibreBridge 7600N or 7500N bridge.

The following diagram shows an example of the initial configuration, in which four FibreBridge 6500N bridges are connecting two SAS storage stacks:

consolidating stacks before
Steps
  1. Using the following guidelines, hot-swap the top FibreBridge 6500N bridge with a FibreBridge 7600N or 7500N bridge using the procedure in Hot-swapping a FibreBridge 6500N bridge with a FibreBridge 7600N or 7500N bridge:

    • Connect the FibreBridge 7600N or 7500N bridge FC1 port to the switch or controller.

      This is the same connection that was made to the FibreBridge 6500N bridge FC1 port.

    • Do not connect the FibreBridge 7600N or 7500N bridge FC2 port at this time. The following diagram shows that bridge_A_1a has been replaced and is now a FibreBridge 7600N or 7500N bridge:

    consolidating stacks 1st 7500n in place
  2. Confirm connectivity to the bridge-connected disks and that the new FibreBridge 7500N is visible in the configuration:

    run local sysconfig -v

    node_A_1> run local sysconfig -v
    NetApp Release 9.3.2X18: Sun Dec 13 01:23:24 PST 2015
    System ID: 0536872165 (node_A_1); partner ID: 0536872141 (node_B_1)
    System Serial Number: 940001025465 (node_A_1)
    System Rev: 70
    System Storage Configuration: Multi-Path HA**<=== Configuration should be multi-path HA**
    .
    .
    .
    slot 0: FC Host Adapter 0g (QLogic 8324 rev. 2, N-port, <UP>)**<=== Initiator port**
    		Firmware rev:      7.5.0
    		Flash rev:         0.0.0
    		Host Port Id:      0x60100
    		FC Node Name:      5:00a:098201:bae312
    		FC Port Name:      5:00a:098201:bae312
    		SFP Vendor:        FINISAR CORP.
    		SFP Part Number:   FTLF8529P3BCVAN1
    		SFP Serial Number: URQ0R1R
    		SFP Capabilities:  4, 8 or 16 Gbit
    		Link Data Rate:    16 Gbit
    		Switch Port:       brcd6505-fcs40:1
      **<List of disks visible to port\>**
    		 ID     Vendor   Model            FW    Size
    		brcd6505-fcs40:12.126L1527     : NETAPP   X302_HJUPI01TSSM NA04 847.5GB (1953525168 512B/sect)
    		brcd6505-fcs40:12.126L1528     : NETAPP   X302_HJUPI01TSSA NA02 847.5GB (1953525168 512B/sect)
    		.
    		.
    		.
    		**<List of FC-to-SAS bridges visible to port\>**
    		FC-to-SAS Bridge:
    		brcd6505-fcs40:12.126L0        : ATTO     FibreBridge7500N A30H  FB7500N100104**<===**
    		brcd6505-fcs42:13.126L0        : ATTO     FibreBridge6500N 1.61  FB6500N102980
    		brcd6505-fcs42:6.126L0         : ATTO     FibreBridge6500N 1.61  FB6500N101167
    		brcd6505-fcs42:7.126L0         : ATTO     FibreBridge6500N 1.61  FB6500N102974
    		.
    		.
    		.
      **<List of storage shelves visible to port\>**
    		brcd6505-fcs40:12.shelf6: DS4243  Firmware rev. IOM3 A: 0200  IOM3 B: 0200
    		brcd6505-fcs40:12.shelf8: DS4243  Firmware rev. IOM3 A: 0200  IOM3 B: 0200
    		.
    		.
    		.
  3. Using the following guidelines, hot-swap the bottom FibreBridge 6500N bridge with a FibreBridge 7600N or 7500N bridge using the procedure in Hot-swapping a FibreBridge 6500N bridge with a FibreBridge 7600N or 7500N bridge:

    • Connect the FibreBridge 7600N or 7500N bridge FC2 port to the switch or controller.

      This is the same connection that was made to the FibreBridge 6500N bridge FC1 port.

    • Do not connect the FibreBridge 7600N or 7500N bridge FC1 port at this time. consolidating stacks 2nd 7500n in place

  4. Confirm connectivity to the bridge-connected disks:

    run local sysconfig -v

    The output shows the disks attached to the initiator ports on the controller, and identifies the shelves connected to the FC-to-SAS bridges:

    node_A_1> run local sysconfig -v
    NetApp Release 9.3.2X18: Sun Dec 13 01:23:24 PST 2015
    System ID: 0536872165 (node_A_1); partner ID: 0536872141 (node_B_1)
    System Serial Number: 940001025465 (node_A_1)
    System Rev: 70
    System Storage Configuration: Multi-Path HA**<=== Configuration should be multi-path HA**
    .
    .
    .
    slot 0: FC Host Adapter 0g (QLogic 8324 rev. 2, N-port, <UP>)**<=== Initiator port**
    		Firmware rev:      7.5.0
    		Flash rev:         0.0.0
    		Host Port Id:      0x60100
    		FC Node Name:      5:00a:098201:bae312
    		FC Port Name:      5:00a:098201:bae312
    		SFP Vendor:        FINISAR CORP.
    		SFP Part Number:   FTLF8529P3BCVAN1
    		SFP Serial Number: URQ0R1R
    		SFP Capabilities:  4, 8 or 16 Gbit
    		Link Data Rate:    16 Gbit
    		Switch Port:       brcd6505-fcs40:1
      **<List of disks visible to port\>**
    		 ID     Vendor   Model            FW    Size
    		brcd6505-fcs40:12.126L1527     : NETAPP   X302_HJUPI01TSSM NA04 847.5GB (1953525168 512B/sect)
    		brcd6505-fcs40:12.126L1528     : NETAPP   X302_HJUPI01TSSA NA02 847.5GB (1953525168 512B/sect)
    		.
    		.
    		.
    		**<List of FC-to-SAS bridges visible to port\>**
    		FC-to-SAS Bridge:
    		brcd6505-fcs40:12.126L0        : ATTO     FibreBridge7500N A30H  FB7500N100104
    		brcd6505-fcs42:13.126L0        : ATTO     FibreBridge7500N A30H  FB7500N100104
    		.
    		.
    		.
      **<List of storage shelves visible to port\>**
    		brcd6505-fcs40:12.shelf6: DS4243  Firmware rev. IOM3 A: 0200  IOM3 B: 0200
    		brcd6505-fcs40:12.shelf8: DS4243  Firmware rev. IOM3 A: 0200  IOM3 B: 0200
    		.
    		.
    		.

Cabling the bridge SAS ports when consolidating storage behind FibreBridge 7600N or 7500N bridges

When consolidating multiple SAS storage stacks behind a single pair of FibreBridge 7600N or 7500N bridges with available SAS ports, you must move the top and bottom SAS cables to the new bridges.

About this task

The FibreBridge 6500N bridge SAS ports use QSFP connectors. The FibreBridge 7600N or 7500N bridge SAS ports use mini-SAS connectors.

Important If you insert a SAS cable into the wrong port, when you remove the cable from a SAS port, you must wait at least 120 seconds before plugging the cable into a different SAS port. If you fail to do so, the system will not recognize that the cable has been moved to another port.
Note Wait at least 10 seconds before connecting the port. The SAS cable connectors are keyed; when oriented correctly into a SAS port, the connector clicks into place and the disk shelf SAS port LNK LED illuminates green. For disk shelves, you insert a SAS cable connector with the pull tab oriented down (on the underside of the connector).
Steps
  1. Remove the cable that connects the SAS A port of the top FibreBridge 6500N bridge to the top SAS shelf, being sure to note the SAS port on the storage shelf to which it connects.

    The cable is shown in blue in the following example:

    consolidating stacks sas top before
  2. Using a cable with a mini-SAS connector, connect the same SAS port on the storage shelf to the SAS B port of the top FibreBridge 7600N or 7500N bridge.

    The cable is shown in blue in the following example:

    consolidating stacks sas top after
  3. Remove the cable that connects the SAS A port of the bottom FibreBridge 6500N bridge to the top SAS shelf, being sure to note the SAS port on the storage shelf to which it connects.

    This cable is shown in green in the following example:

    consolidating stacks sas bottom before
  4. Using a cable with a mini-SAS connector, connect the same SAS port on the storage shelf to the SAS B port of the bottom FibreBridge 7600N or 7500N bridge.

    This cable is shown in green in the following example:

    consolidating stacks sas bottom after
  5. Confirm connectivity to the bridge-connected disks:

    run local sysconfig -v

    The output shows the disks attached to the initiator ports on the controller, and identifies the shelves connected to the FC-to-SAS bridges:

    node_A_1> run local sysconfig -v
    NetApp Release 9.3.2X18: Sun Dec 13 01:23:24 PST 2015
    System ID: 0536872165 (node_A_1); partner ID: 0536872141 (node_B_1)
    System Serial Number: 940001025465 (node_A_1)
    System Rev: 70
    System Storage Configuration: Multi-Path HA**<=== Configuration should be multi-path HA**
    .
    .
    .
    slot 0: FC Host Adapter 0g (QLogic 8324 rev. 2, N-port, <UP>)**<=== Initiator port**
    		Firmware rev:      7.5.0
    		Flash rev:         0.0.0
    		Host Port Id:      0x60100
    		FC Node Name:      5:00a:098201:bae312
    		FC Port Name:      5:00a:098201:bae312
    		SFP Vendor:        FINISAR CORP.
    		SFP Part Number:   FTLF8529P3BCVAN1
    		SFP Serial Number: URQ0R1R
    		SFP Capabilities:  4, 8 or 16 Gbit
    		Link Data Rate:    16 Gbit
    		Switch Port:       brcd6505-fcs40:1
      **<List of disks visible to port\>**
    		 ID     Vendor   Model            FW    Size
    		brcd6505-fcs40:12.126L1527     : NETAPP   X302_HJUPI01TSSM NA04 847.5GB (1953525168 512B/sect)
    		brcd6505-fcs40:12.126L1528     : NETAPP   X302_HJUPI01TSSA NA02 847.5GB (1953525168 512B/sect)
    		.
    		.
    		.
    		**<List of FC-to-SAS bridges visible to port\>**
    		FC-to-SAS Bridge:
    		brcd6505-fcs40:12.126L0        : ATTO     FibreBridge7500N A30H  FB7500N100104
    		brcd6505-fcs42:13.126L0        : ATTO     FibreBridge7500N A30H  FB7500N100104
    		.
    		.
    		.
      **<List of storage shelves visible to port\>**
    		brcd6505-fcs40:12.shelf6: DS4243  Firmware rev. IOM3 A: 0200  IOM3 B: 0200
    		brcd6505-fcs40:12.shelf8: DS4243  Firmware rev. IOM3 A: 0200  IOM3 B: 0200
    		.
    		.
    		.
  6. Remove the old FibreBridge 6500N bridges that are no longer connected to the SAS storage.

  7. Wait two minutes for the system to recognize the changes.

  8. If the system was cabled incorrectly, remove the cable, correct the cabling, and then reconnect the correct cable.

  9. If necessary, repeat the preceding steps to move up to two additional SAS stacks behind the new FibreBridge 7600N or 7500N bridges, using SAS ports C and then D.

    Each SAS stack must be connected to the same SAS port on the top and bottom bridge. For example, if the top connection of the stack is connected to the top bridge SAS B port, the bottom connection must be connected to the SAS B port of the bottom bridge.

    consolidation sas bottom connection 4 stacks

Updating zoning when adding FibreBridge 7600N or 7500N bridges to a configuration

The zoning must be changed when you are replacing FibreBridge 6500N bridges with FibreBridge 7600N or 7500N bridges and using both FC ports on the FibreBridge 7600N or 7500N bridges. The required changes depend on whether you are running a version of ONTAP earlier than 9.1 or 9.1 and later.

Updating zoning when adding FibreBridge 7500N bridges to a configuration (prior to ONTAP 9.1)

The zoning must be changed when you are replacing FibreBridge 6500N bridges with FibreBridge 7500N bridges and using both FC ports on the FibreBridge 7500N bridges. Each zone can have no more than four initiator ports. The zoning you use depends on whether you are running ONTAP prior to version 9.1 or 9.1 and later

About this task

The specific zoning in this task is for versions of ONTAP prior to version 9.1.

The zoning changes are required to avoid issues with ONTAP, which requires that no more than four FC initiator ports can have a path to a disk. After recabling to consolidate the shelves, the existing zoning would result in each disk being reachable by eight FC ports. You must change the zoning to reduce the initiator ports in each zone to four.

The following diagram shows the zoning on site_A before the changes:

zoning consolidation site a before
Steps
  1. Update the storage zones for the FC switches by removing half of the initiator ports from each existing zone and creating new zones for the FibreBridge 7500N FC2 ports.

    The zones for the new FC2 ports will contain the initiator ports removed from the existing zones. In the diagrams, these zones are shown with dashed lines.

    For details about the zoning commands, see the FC switch sections of the Fabric-attached MetroCluster installation and configuration or Stretch MetroCluster installation and configuration.

    The following examples show the storage zones and the ports in each zone before and after the consolidation. The ports are identified by domain, port pairs.

    • Domain 5 consists of switch FC_switch_A_1.

    • Domain 6 consists of switch FC_switch_A_2.

    • Domain 7 consists of switch FC_switch_B_1.

    • Domain 8 consists of switch FC_switch_B_2.

Before or after consolidation

Zone

Domains and ports

Colors in diagrams (The diagrams only show Site A)

Zones before the consolidation. There is a zone for each FC port on the four FibreBridge 6500N bridges.

STOR_A_1a-FC1

5,1; 5,2; 5,4; 5,5; 7,1; 7,2; 7,4; 7,5; 5,6

Purple + dashed purple + blue

STOR_A_1b-FC1

6,1; 6,2; 6,4; 6,5; 8,1; 8,2; 8,4; 8,5; 6,6

Brown + dashed brown + green

STOR_A_2a-FC1

5,1; 5,2; 5,4; 5,5; 7,1; 7,2; 7,4; 7,5; 5,7

Purple + dashed purple + red

STOR_A_2b-FC1

6,1; 6,2; 6,4; 6,5; 8,1; 8,2; 8,4; 8,5; 6,7

Brown + dashed brown + orange

Zones after the consolidation. There is a zone for each FC port on the two FibreBridge 7500N bridges.

STOR_A_1a-FC1

7,1; 7,4; 5,1; 5,4; 5,6

Purple + blue

STOR_A_1b-FC1

7,2; 7,5; 5,2; 5,5; 5,7

Dashed purple + red

STOR_A_1a-FC2

8,1; 8,4; 6,1; 6,4; 6,6

Brown + green

STOR_A_1b-FC2

8,2; 8,5; 6,2; 6,5; 6,7

Dashed brown + orange

The following diagram shows zoning at site_A after the consolidation:

zoning consolidation site a after

Updating zoning when adding FibreBridge 7600N or 7500N bridges to a configuration (ONTAP 9.1 and later)

The zoning must be changed when you are replacing FibreBridge 6500N bridges with FibreBridge 7600N or 7500N bridges and using both FC ports on the FibreBridge 7600N or 7500N bridges. Each zone can have no more than four initiator ports.

About this task
  • This task applies to ONTAP 9.1 and later.

  • FibreBridge 7600N bridges are supported in ONTAP 9.6 and later.

  • The specific zoning in this task is for ONTAP 9.1 and later.

  • The zoning changes are required to avoid issues with ONTAP, which requires that no more than four FC initiator ports can have a path to a disk.

    After recabling to consolidate the shelves, the existing zoning would result in each disk being reachable by eight FC ports. You must change the zoning to reduce the initiator ports in each zone to four.

Step
  1. Update the storage zones for the FC switches by removing half of the initiator ports from each existing zone and creating new zones for the FibreBridge 7600N or 7500N FC2 ports.

    The zones for the new FC2 ports will contain the initiator ports removed from the existing zones.

    Refer to the FC switch section of Fabric-attached MetroCluster installation and configuration for details about the zoning commands.

Cabling the second bridge FC port when adding FibreBridge 7600N or 7500N bridges to a configuration

To provide multiple paths to the storage stacks, you can cable the second FC port on each FibreBridge 7600N or 7500N bridge when you have added the FibreBridge 7600N or 7500N bridge to your configuration.

Before you begin

The zoning must have been adjusted to provide zones for the second FC ports.

Steps
  1. Cable the FC2 port of the top bridge to the correct port on FC_switch_A_2.

    consolidating stacks sas ports recabled
  2. Cable the FC1 port of the bottom bridge to the correct port on FC_switch_A_1.

    consolidating stacks final
  3. Confirm connectivity to the bridge-connected disks:

    run local sysconfig -v

    The output shows the disks attached to the initiator ports on the controller, and identifies the shelves connected to the FC-to-SAS bridges:

    node_A_1> run local sysconfig -v
    NetApp Release 9.3.2X18: Sun Dec 13 01:23:24 PST 2015
    System ID: 0536872165 (node_A_1); partner ID: 0536872141 (node_B_1)
    System Serial Number: 940001025465 (node_A_1)
    System Rev: 70
    System Storage Configuration: Multi-Path HA**<=== Configuration should be multi-path HA**
    .
    .
    .
    slot 0: FC Host Adapter 0g (QLogic 8324 rev. 2, N-port, <UP>)**<=== Initiator port**
    		Firmware rev:      7.5.0
    		Flash rev:         0.0.0
    		Host Port Id:      0x60100
    		FC Node Name:      5:00a:098201:bae312
    		FC Port Name:      5:00a:098201:bae312
    		SFP Vendor:        FINISAR CORP.
    		SFP Part Number:   FTLF8529P3BCVAN1
    		SFP Serial Number: URQ0R1R
    		SFP Capabilities:  4, 8 or 16 Gbit
    		Link Data Rate:    16 Gbit
    		Switch Port:       brcd6505-fcs40:1
      **<List of disks visible to port\>**
    		 ID     Vendor   Model            FW    Size
    		brcd6505-fcs40:12.126L1527     : NETAPP   X302_HJUPI01TSSM NA04 847.5GB (1953525168 512B/sect)
    		brcd6505-fcs40:12.126L1528     : NETAPP   X302_HJUPI01TSSA NA02 847.5GB (1953525168 512B/sect)
    		.
    		.
    		.
    		**<List of FC-to-SAS bridges visible to port\>**
    		FC-to-SAS Bridge:
    		brcd6505-fcs40:12.126L0        : ATTO     FibreBridge7500N A30H  FB7500N100104
    		brcd6505-fcs42:13.126L0        : ATTO     FibreBridge7500N A30H  FB7500N100104
    		.
    		.
    		.
      **<List of storage shelves visible to port\>**
    		brcd6505-fcs40:12.shelf6: DS4243  Firmware rev. IOM3 A: 0200  IOM3 B: 0200
    		brcd6505-fcs40:12.shelf8: DS4243  Firmware rev. IOM3 A: 0200  IOM3 B: 0200
    		.
    		.
    		.

Disabling unused SAS ports on the FC-to-SAS bridges

After making cabling changes to the bridge, you should disable any unused SAS ports on FC-to-SAS bridges to avoid health monitor alerts related to the unused ports.

Steps
  1. Disable unused SAS ports on the top FC-to-SAS bridge:

    1. Log in to the bridge CLI.

    2. Disable any unused ports.

      Note

      If you have configured an ATTO 7500N bridge, then all of the SAS ports (A through D) are enabled by default, and you must disable the SAS ports that are not being used:

      SASPortDisable sas port

      If SAS ports A and B are used, then SAS ports C and D must be disabled. In the following example, the unused SAS ports C and D are disabled:

      Ready. *
      SASPortDisable C
      
      SAS Port C has been disabled.
      
      Ready. *
      SASPortDisable D
      
      SAS Port D has been disabled.
      
      Ready. *
    3. Save the bridge configuration:
      SaveConfiguration

      The following example shows that SAS ports C and D have been disabled. Note that the asterisk no longer appears, indicating that the configuration has been saved.

      Ready. *
      SaveConfiguration
      
      Ready.
  2. Repeat the previous step on the bottom FC-to-SAS bridge.