Obtain additional equipment and tools
Before installing a StorageGRID appliance, confirm you have all of the additional equipment and tools that you need.
All appliances
You need the following equipment to install and configure all appliances.
Item | What it looks like | ||
---|---|---|---|
Screwdrivers |
|
||
ESD wrist strap |
|||
Service laptop |
|
||
Optional tools |
|
SGF6112
You need the following additional equipment to install and configure the SGF6112 hardware.
Item | What it looks like |
---|---|
Optical cables and transceivers |
|
RJ-45 (Cat5/Cat5e/Cat6/Cat6a) Ethernet cables |
SG6000
You need the following additional equipment to install and configure the SG6000 hardware.
Item | What it looks like |
---|---|
Optical cables and SFP transceivers |
|
RJ-45 (Cat5/Cat5e/Cat6) Ethernet cables |
|
Optional tools |
Mechanized lift for 60-drive shelves |
SG5700
You need the following additional equipment to install and configure the SG5700 hardware.
Item | What it looks like |
---|---|
Optical cables and SFP transceivers |
|
Ethernet cables |
|
Optional tools |
Mechanized lift for SG5760 |
SG100 and SG1000
You need the following additional equipment to install and configure the SG100 and SG1000 hardware.
Item | What it looks like |
---|---|
Optical cables and transceivers |
|
RJ-45 (Cat5/Cat5e/Cat6/Cat6a) Ethernet cables |