Skip to main content
Install and maintain

Controller replacement workflow - AFF A20, AFF A30, and AFF A50

Contributors netapp-lisa netapp-jsnyder

Follow these workflow steps to replace your controller.

To replace the controller, you must meet certain requirements.

Shut down or take over the impaired controller so that the healthy controller continues to serve data from the impaired controller storage.

Replacing the controller includes removing the impaired controller, moving FRU components to the replacement controller, installing the replacement controller in the chassis, setting the time and date, and then recabling.

Verify the low-level system configuration of the replacement controller and reconfigure system settings as necessary.

Transfer the ownership of storage resources back to the replacement controller.

Verify the LIFs, check cluster health, and return the failed part to NetApp.