Controller replacement workflow - AFF C30 and AFF C60

Contributors netapp-jsnyder

Follow these workflow steps to replace your controller.

To replace the controller, you must meet certain requirements.

Shut down or take over the impaired controller so that the healthy controller continues to serve data from the impaired controller storage.

Replacing the controller includes removing the impaired controller, moving the FRU components to the replacement controller, and then installing the replacement controller in the enclosure.

Verify the low-level system configuration of the replacement controller and reconfigure system settings as necessary.

Recable the controller and transfer the ownership of storage resources back to the replacement controller.

Verify the LIfs, check cluster health, and return the failed part to NetApp.