Controller replacement workflow - AFF C30 and AFF C60
-
PDF of this doc site

Collection of separate PDF docs
Creating your file...
Get started with replacing the controller in your AFF C30 or AFF C60 storage system by shutting down the impaired controller, removing and replacing the controller, restoring the system configuration, and returning control of storage resources to the replacement controller.
To replace the controller, you must meet certain requirements.
Shut down or take over the impaired controller so that the healthy controller continues to serve data from the impaired controller storage.
Replacing the controller includes removing the impaired controller, moving FRU components to the replacement controller, installing the replacement controller in the chassis, setting the time and date, and then recabling.
Verify the low-level system configuration of the replacement controller and reconfigure system settings as necessary.
Transfer the ownership of storage resources back to the replacement controller.
Verify the LIFs, check cluster health, and return the failed part to NetApp.