Controller replacement workflow - AFF C80
-
PDF of this doc site

Collection of separate PDF docs
Creating your file...
Get started with replacing the controller in your AFF C80 storage system by shutting down the impaired controller, removing and replacing the controller, restoring the system configuration, and returning control of storage resources to the replacement controller.
To replace the controller module, you must meet certain requirements.
Shut down or take over the impaired controller so that the healthy controller continues to serve data from the impaired controller storage.
Replacing the controller includes removing the impaired controller, moving the FRU components to the replacement controller module, and then installing the replacement controller module in the enclosure.
Verify the low-level system configuration of the replacement controller and reconfigure system settings as necessary.
Recable the controller and transfer the ownership of storage resources back to the replacement controller.
Verify the LIfs, check cluster health, and return the failed part to NetApp.