Install and maintain

Detailed steps - FAS9500

Contributors dougthomp netapp-martyh

This article gives detailed step-by-step instructions for installing a typical NetApp system. Use this article if you want more detailed installation instructions.

Step 1: Prepare for installation

To install your system, you need to create an account on the NetApp Support Site, register your system, and get license keys. You also need to inventory the appropriate number and type of cables for your system and collect specific network information.

You need to have access to the NetApp Hardware Universe for information about site requirements as well as additional information on your configured system.

What you need

You might also want to have access to the ONTAP 9 Release Notes for your version of ONTAP for more information about this system.

You need to provide the following at your site:

  • Rack space for the storage system

  • Phillips #2 screwdriver

  • Additional networking cables to connect your system to your network switch and laptop or console with a Web browser

Steps
  1. Unpack the contents of all boxes.

  2. Record the system serial number from the controllers.

    Example of system serial number
  3. Inventory and make a note of the number and types of cables you received.

    The following table identifies the types of cables you might receive. If you receive a cable not listed in the table, see the Hardware Universe to locate the cable and identify its use.

    Type of cable…​ Part number and length Connector type For…​

    25 GbE data Cable

    X66240A-05 (112-00639), 0.5m

    X66240A-2 (112-00598), 2m

    X66240A-5 (112-00600), 5m

    Gbe SFP copper connector

    Network cable

    32 Gb FC (SFP+ Op)

    X66250-2 (112-00342), 2m

    X66250-5 (112-00344), 5m

    X66250-15 (112-00346), 15m

    Gbe SFP copper connector

    FC optical network cable

    40 GbE network cable

    X66100-1 (112-00542), 1m

    X66100-3 (112-00543), 3m

    X66100-5 (112-00544), 5m

    100 Gbe QSFP connector

    Ethernet data, cluster network

    100 GbE cable

    X66211B-1 (112-00573), 1m

    X66211B-2 (112-00574), 2m

    X66211B-5 (112-00576), 5m

    100 Gbe QSFP connector

    Network,

    Ethernet data,

    cluster network

    Optical cables

    X66031A (112-00436), 1m

    X66032A (112-00437), 2m

    X66033A (112-00438), 3m

    oie cable fiber lc connector

    FC optical network

    Cat 6, RJ-45 (order dependent)

    Part numbers X6585-R6 (112-00291), 3m

    X6562-R6 (112-00196), 5m

    RJ-45 connector

    Management network and Ethernet data

    Storage

    X66031A (112-00436), 1m

    X66032A (112-00437), 2m

    X66033A (112-00438), 3m

    oie cable mini sas hd to mini sas hd

    Storage

    Micro-USB console cable

    Not applicable

    image::../media/oie_cable_micro_usb.pngMicro USB connector]

    Console connection during software setup on non-Windows or Mac laptop/console

    Power cables

    Not applicable

    Power cables

    Powering up the system

  4. Review the ONTAP Configuration Guide and collect the required information listed in that guide.

Step 2: Install the hardware

You need to install your system in a 4-post rack or NetApp system cabinet, as applicable.

  1. Install the rail kits, as needed.

  2. Install and secure your system using the instructions included with the rail kit.

    Note You need to be aware of the safety concerns associated with the weight of the system.

    The label on the left indicates an empty chassis, while the label on the right indicates a fully-populated system.

    Weight lifting caution label
  3. Attach cable management devices (as shown).

    Lifting handles and cable management device
  4. Place the bezel on the front of the system.

Step 3: Cable controllers to your network

You can cable the controllers to your network by using the two-node switchless cluster method or by using the cluster interconnect network.

Option 1: Two-node switchless cluster

Management network, data network, and management ports on the controllers are connected to switches. The cluster interconnect ports are cabled on both controllers.

Before you begin

You must have contacted your network administrator for information about connecting the system to the switches.

Be sure to check the direction of the cable pull-tabs when inserting the cables in the ports. Cable pull-tabs are up for all networking module ports.

Cable pull tab direction
Note As you insert the connector, you should feel it click into place; if you do not feel it click, remove it, turn it over and try again.
  1. Use the animation or illustration to complete the cabling between the controllers and to the switches:

    Animation - Two-node switchless cluster cabling
    drw 9500 tnsc network cabling
    Step Perform on each controller

    image::../media/icon_square_1_green.png

    Cable cluster interconnect ports:

    • Slot A4 and B4 (e4a)

    • Slot A8 and B8 (e8a)

    100 Gbe QSFP connector
    Callout icon 2

    Cable controller management (wrench) ports.

    image::../media/oie_cable_rj45.png

    Callout icon 3

    Cable 32 Gb FC network switches:

    Ports in slot A3 and B3 (e3a and e3c) and slot A9 and B9 (e9a and e9c) to the 32 Gb FC network switches.

    Gbe SFP copper connector

    40GbE host network switches:

    Cable host‐side b ports in slot A4 and B4 (e4b) and slot A8 and B8 (e8b) to the host switch.

    100 Gbe QSFP connector

    image::../media/icon_square_4_red.png

    Cable 25 GbE connections:

    Cable ports in slot A5 and B5 (5a, 5b, 5c, and 5d) and slot A7 and B7 (7a, 7b, 7c, and 7d) to the 25 GbE network switches.

    Gbe SFP copper connector
    • Strap the cables to the cable management arms (not shown).

    • Connect the power cables to the PSUs and connect them to different power sources (not shown). PSU 1 and 3 provide power to all side A components, while PSU2 and PSU4 provide power to all side B components.

    Power cables
    Power sources
Option 2: Switched cluster

Management network, data network, and management ports on the controllers are connected to switches. The cluster interconnect and HA ports are cabled on to the cluster/HA switch.

Before you begin

You must have contacted your network administrator for information about connecting the system to the switches.

Be sure to check the direction of the cable pull-tabs when inserting the cables in the ports. Cable pull-tabs are up for all networking module ports.

Cable pull tab direction
Note As you insert the connector, you should feel it click into place; if you do not feel it click, remove it, turn it over and try again.
  1. Use the animation or illustration to complete the cabling between the controllers and to the switches:

    Animation - Switched cluster cabling
    drw 9500 switched network cabling
    Step Perform on each controller
    Callout number 1

    Cable cluster interconnect a ports:

    • Slot A4 and B4 (e4a) to the cluster network switch.

    • Slot A8 and B8 (e8a) to the cluster network switch.

    100 Gbe QSFP connector
    Callout icon 2

    Cable controller management (wrench) ports.

    RJ-45 connector
    Callout icon 3

    Cable 32 Gb FC network switches:

    Ports in slot A3 and B3 (e3a and e3c) and slot A9 and B9 (e9a and e9c) to the 32 Gb FC network switches.

    Gbe SFP copper connector

    40GbE host network switches:

    Cable host‐side b ports in slot A4 and B4 (e4b) and slot A8 and B8 (e8b) to the host switch.

    100 Gbe QSFP connector
    Callout icon 4

    Cable 25 GbE connections:

    Cable ports in slot A5 and B5 (5a, 5b, 5c, and 5d) and slot A7 and B7 (7a, 7b, 7c, and 7d) to the 25 GbE network switches.

    image::../media/oie_cable_sfp_gbe_copper.png

    • Strap the cables to the cable management arms (not shown).

    • Connect the power cables to the PSUs and connect them to different power sources (not shown). PSU 1 and 3 provide power to all side A components, while PSU2 and PSU4 provide power to all side B components.

    Power cables
    Power sources

Step 4: Cable controllers to drive shelves

Cable either DS212C or DS224C drive shelves to your controllers.

Note For more SAS cabling information and worksheets, see SAS cabling rules, worksheets, and examples overview - shelves with IOM12 modules
Before you begin
Cable pull tab direction
Cable pull tab direction
Note As you insert the connector, you should feel it click into place; if you do not feel it click, remove it, turn it over and try again.
  1. Use the following animation or drawings to cable your controllers to three (1 stack of one drive shelf and one stack of two drive shelves) DS224C drive shelves.

    Animation - Cable your drive shelves
    drw 9500 sas shelf cabling
    Step Perform on each controller
    icon square 1 blue

    Connect drive shelf stack one to the controllers, using the graphic for reference.

    oie cable mini sas hd to mini sas hd

    mini-SAS cable

    Callout icon 2

    Connect drive shelf stack two to the controllers, using the graphic for reference.

    oie cable mini sas hd to mini sas hd

    mini-SAS cable

Step 5: Complete system setup and configuration

You can complete the system setup and configuration using cluster discovery with only a connection to the switch and laptop, or by connecting directly to a controller in the system and then connecting to the management switch.

Option 1: If network discovery is enabled

If you have network discovery enabled on your laptop, you can complete system setup and configuration using automatic cluster discovery.

  1. Use the following animation or drawing to set one or more drive shelf IDs:

    Animation - Set your shelf ID's
    drw power on set shelf ID set
    Callout number 1

    Remove the end cap.

    Callout number 2

    Press and hold shelf ID button until first digit blinks, then push to advance to 0-9.

    Note The first digit continues to blink
    Callout number 2

    Press and hold shelf ID button until second digit blinks, then push to advance to 0-9.

    Note The first digit stops blinking, and the second digit continues to blink.
    Callout number 4

    Replace the end cap.

    Callout number 5

    Wait 10 seconds for the Amber LED (!) to appear, then power-cycle the drive shelf to set shelf ID.

  2. Turn on the power switches on the power supplies to both nodes.

    Animation - Turn on the power to the controllers
    drw 9500 power on
    Note Initial booting may take up to eight minutes.
  3. Make sure that your laptop has network discovery enabled.

    See your laptop's online help for more information.

  4. Use the following animation to connect your laptop to the Management switch.

    Animation - Connect your laptop to the Management switch
    dwr laptop to switch only
  5. Select an ONTAP icon listed to discover:

    drw autodiscovery controler select
    1. Open File Explorer.

    2. Click network in the left pane.

    3. Right click and select refresh.

    4. Double-click either ONTAP icon and accept any certificates displayed on your screen.

      Note XXXXX is the system serial number for the target node.

      System Manager opens.

  6. Use System Manager guided setup to configure your system using the data you collected in the ONTAP Configuration Guide.

  7. Set up your account and download Active IQ Config Advisor:

    1. Log in to your existing account or create an account.

    2. Register your system.

    3. Download Active IQ Config Advisor.

  8. Verify the health of your system by running Config Advisor.

  9. After you have completed the initial configuration, go to the ONTAP & ONTAP System Manager Documentation Resources page for information about configuring additional features in ONTAP.

Option 2: If network discovery is not enabled

If you are not using a Windows or Mac-based laptop or console or if auto discovery is not enabled, you must complete the configuration and setup using this task.

  1. Cable and configure your laptop or console:

    1. Set the console port on the laptop or console to 115,200 baud with N-8-1.

      Note See your laptop or console's online help for how to configure the console port.
    2. Connect the console cable to the laptop or console using the console cable that came with your system, and then connect the laptop to the switch on the management subnet.

      drw 9500 cable console switch controller
    3. Assign a TCP/IP address to the laptop or console, using one that is on the management subnet.

  2. Use the following animation to set one or more drive shelf IDs:

    Animation - Set your shelf ID's
    drw power on set shelf ID set
    Callout number 1

    Remove the end cap.

    Callout number 2

    Press and hold shelf ID button until first digit blinks, then push to advance to 0-9.

    Note The first digit continues to blink
    Callout number 2

    Press and hold shelf ID button until second digit blinks, then push to advance to 0-9.

    Note The first digit stops blinking, and the second digit continues to blink.
    Callout number 4

    Replace the end cap.

    Callout number 5

    Wait 10 seconds for the Amber LED (!) to appear, then power-cycle the drive shelf to set shelf ID.

  3. Turn on the power switches on the power supplies to both nodes.

    Animation - Turn on the power to the controllers
    drw 9500 power on
Note Initial booting may take up to eight minutes.
  1. Assign an initial node management IP address to one of the nodes.

    If the management network has DHCP…​ Then…​

    Configured

    Record the IP address assigned to the new controllers.

    Not configured

    1. Open a console session using PuTTY, a terminal server, or the equivalent for your environment.

      Note Check your laptop or console's online help if you do not know how to configure PuTTY.
    2. Enter the management IP address when prompted by the script.

  2. Using System Manager on your laptop or console, configure your cluster:

    1. Point your browser to the node management IP address.

      Note The format for the address is https://x.x.x.x.
    2. Configure the system using the data you collected in the ONTAP Configuration Guide .

  3. Set up your account and download Active IQ Config Advisor:

    1. Log in to your existing account or create an account.

    2. Register your system.

    3. Download Active IQ Config Advisor.

  4. Verify the health of your system by running Config Advisor.

  5. After you have completed the initial configuration, go to the ONTAP & ONTAP System Manager Documentation Resources page for information about configuring additional features in ONTAP.